BESS + Grid Power: A Cleaner Alternative to Cycle Charging

Construction sites in Singapore face a dual challenge, the pressure to cut emissions and the reality of limited grid power, often capped at just 63A.

The Infinity Cube Battery Energy Storage System (BESS) offers a smart solution: a setup that uses the grid only when necessary, while the battery handles most of the site’s power needs. Even with limited grid capacity, this system works, because the battery can charge slowly during off-peak periods and power the load independently when needed.

This makes it one of the cleanest and most efficient ways to meet high site demand without overloading the grid.

How BESS Works Together with Grid Power

  • The Infinity Cube BESS powers the load (e.g., tower crane, site office) as the main source of energy.

  • When battery SOC drops (e.g., 30%), the system automatically taps the grid to recharge — even on a limited connection like 63A.

  • Once the battery reaches ~95–100% SOC, the grid charging stops and the BESS resumes full supply.

⚡ Even with limited grid capacity, Infinity Cube manages demand efficiently by spreading charging over time.

 

Key Characteristics

  • Emission-free, quiet operation

  • Uses grid efficiently, no overdraw

  • Suitable for grid-limited zones like HDB projects or temporary cabins

  • No noise or fumes — perfect near residential areas

Real Site Results: How Cycle Charging Works

(Data captured from EMS at a live site in Singapore using the Infinity Cube BESS.)

Graph showing SOC (orange) and grid charging periods (red), with a 63A grid connection slowly charging the battery from 40% to 100% SOC adding approximately 40 kWh over 3 hours.

 

This graph captures how the Infinity Cube BESS works in a real project with restricted grid access. The battery powers the site continuously, while grid input only activates during scheduled charging windows keeping power delivery steady and the site clean and quiet.

Key Points to Highlight on the Graph:

SOC drops to 40%

This marks the battery’s lower threshold. The system automatically detects the drop and activates charging from the grid.

SOC returns to 100%

Once the battery is recharged, grid input stops. The system resumes battery-only mode, ensuring uninterrupted power while keeping grid usage efficient and minimal.

Why This Matters

Cleaner Operation

BESS output is silent, with no emissions. Best suited for urban environments where noise control is critical, such as HDBs and schools.

Reduced Grid Stress

Unlike direct connections, this setup avoids peak-time grid overuse, helping utility providers maintain stability.

Supports BCA Green Mark Certification

Aligns with energy-saving benchmarks and carbon reduction goals.

Scalable for All Site Sizes

From tower cranes to passenger hoists, this bess + limited power grid works

Supporting NEA Regulations on Energy and Emissions

The National Environment Agency (NEA) enforces construction-related limits on emissions and noise. By shifting power delivery to the silent-running BESS, and limiting use of high-emission backup sources, sites can more easily meet:

  • Noise limits (especially near residential zones)
  • Air quality controls (particulate matter, NOx)
  • Energy reporting standards for large users (under NEA’s Energy Conservation Act)

💡 Did you know? Infinity Cube’s EMS platform logs energy flow, and load profiles making it easier to prepare sustainability or regulatory reports.

📌 Reference: Singapore’s First Biennial Transparency Report – NEA

Summary Table: BESS + Grid Is a Practical Option for Construction

BenefitImpact
Smarter grid usageBattery draws from the grid only when charging is needed
Works with limited grid capacitySupports slow charging even with 63A grid
Reduced energy wasteStops charging when battery reaches 100% SOC
Lower emissionsBattery remains the primary power source (no genset noise or smoke)
Quiet operationSuitable for noise-sensitive zones near residential areas
Green Mark-friendlyHelps meet energy efficiency targets in BCA guidelines
Built-in intelligenceEMS auto-triggers grid input only when needed, no manual switching

Ready to Power Smarter with Grid + BESS?

Choon Huat Engineering provides plug-and-play Infinity Cube systems that work with temporary grid setups. Our team can help you optimise power, reduce emissions, and meet project sustainability goals.

📌 No grid access? No problem.

Infinity Cube can also be deployed with a generator in cycle charging mode, cutting fuel use by up to 70%.

👉 See how cycle charging with Infinity Cube works →

Explore Our Net-Zero Equipment Range:

Related Posts