PROJECT details
North South Corridor (NSC) Construction of a 1.25km stretch of the corridor between Novena RIse and Toa Payoh Rise
- Period: Year 2018 - 2026
- Scope of Supply: Generators (25kva - 300kva), LED Tower Lights (4 x 400 watts, 4 x 100 watts)